FOR HANDLING CORE SCRAP, PIG-IRON, STONES, SLAG, OA SCRAP, GREEN PELLETS, BLAST FURNACE…... PILED AND BULK MATERIAL DENSITY UP TO 1,8 t/m³
Request offer
					 | Equipment needed | |||||||
| • 2 lifting cables. | |||||||
| • 2 opening / closing cables. | |||||||
| Technical information | |||||||
| • Robust structure in S355 J2G3 rolled steel. | |||||||
| • Complete load through maximum penetration force. | |||||||
| • Design & fabrication according to standard FEM 1001/98 section I. | |||||||
| • CE conformity. | |||||||