FOR HANDLING FERTILIZER, CEREALS, COAL, CEMENT, CLINKER, PILED AND BULK MATERIAL UP TO 1,8 t/m³ DENSITY
Request offer
| Equipment needed | ||||||||
| • 1 lifting cable. | ||||||||
| • 1 opening / closing cable. | ||||||||
| Technical information | ||||||||
| • Robust structure in S355 J2G3 rolled steel. | ||||||||
| • Complete load through maximum penetration force. | ||||||||
| • Design & fabrication according to standard FEM 1001/98 section I. | ||||||||
| • CE conformity. | ||||||||