Blug Credeblug, s.l.

TONGS PMB-300

PMB-300

FOR HANDLING ROCKS AND IRREGULAR UNITARY STONES FOR BREACKWATER CONSTRUCTION

Request offer

Videos

Related products

Technical sheet

Esquema 02
Equipment needed        
• 1 lifting cable.  
• 1 opening / closing cable.  
Technical information        
• Robust structure in high strenght steel.  
• Complete load through maximum penetration force.  
• Ideal relation between capacity / dead weight.
• Design & fabrication according to standard FEM 1001/98 section I.    
• CE conformity.  
Tabla de datos
Esquema 01