FOR ALL LOAD TYPE LIFTING AND POSITIONING.
Equipment needed | ||||||||
• Hook(s) or lifting chain(s). | ||||||||
• Electric connection for hydraulic unit. | ||||||||
Technical information | ||||||||
• Robust structure in S355 J2G3 rolled steel. | ||||||||
• Full rotation (360º) for a perfect load's positioning. | ||||||||
• Design & fabrication according to standard FEM 1001/98 section I. | ||||||||
• CE conformity. |