FOR ALL LOAD TYPE LIFTING AND POSITIONING.
| Equipment needed | ||||||||
| • Hook(s) or lifting chain(s). | ||||||||
| • Electric connection for hydraulic unit. | ||||||||
| Technical information | ||||||||
| • Robust structure in S355 J2G3 rolled steel. | ||||||||
| • Full rotation (360º) for a perfect load's positioning. | ||||||||
| • Design & fabrication according to standard FEM 1001/98 section I. | ||||||||
| • CE conformity. | ||||||||