FOR HANDLING ROCKS AND IRREGULAR UNITARY STONES FOR BREACKWATER CONSTRUCTION
					 | Equipment needed | ||||||||
| • 1 lifting cable. | ||||||||
| • 1 opening / closing cable. | ||||||||
| Technical information | ||||||||
| • Robust structure in high strenght steel. | ||||||||
| • Complete load through maximum penetration force. | ||||||||
| • Ideal relation between capacity / dead weight. | ||||||||
| • Design & fabrication according to standard FEM 1001/98 section I. | ||||||||
| • CE conformity. | ||||||||