UP TO 4 ARCH-STONES HANDLING AT THE SAME TIME
					 | Equipment needed | ||||||||
| • 4 lifting cables. | ||||||||
| • Electric connection for electro-mechanical system. | ||||||||
| Technical information | ||||||||
| • Robust structure in S355 J2G3 rolled steel. | ||||||||
| • Luminous signposting of status. | ||||||||
| • Gripping force protection system. | ||||||||
| • Maximum / minimum opening control device. | ||||||||
| • Safety switch to avoid opening when loaded. | ||||||||
| • Design & fabrication according to standard FEM 1001/98 section I. | ||||||||
| • CE conformity. | ||||||||