UP TO 4 ARCH-STONES HANDLING AT THE SAME TIME
Equipment needed | ||||||||
• 4 lifting cables. | ||||||||
• Electric connection for electro-mechanical system. | ||||||||
Technical information | ||||||||
• Robust structure in S355 J2G3 rolled steel. | ||||||||
• Luminous signposting of status. | ||||||||
• Gripping force protection system. | ||||||||
• Maximum / minimum opening control device. | ||||||||
• Safety switch to avoid opening when loaded. | ||||||||
• Design & fabrication according to standard FEM 1001/98 section I. | ||||||||
• CE conformity. |