Blug Credeblug, s.l.

ORANGE PEEL GRABS Request offer

ORANGE PEEL MOTOR GRABS

Technology: ORANGE PEEL MOTOR GRABS

Description: Electro-hydraulically operated orange peel grab composed by: electric engine, pump and electro-hydraulic valves which provide the pressure to the system and grab’s arms (jaws) being all the elements assembled into the machine’s body. The grab will be suspended from any type of elevation equipment and it only needs to be connected to an electric point using a flexible hose which comes from a coiler (not supplied by us). THE MOST APPROPRIATE REFERENCE WILL DEPEND ON THE MATERIAL TO BE HANDLED AND ALSO THE CRANE TYPE AND CAPACITY.

P-0,7

Of material to handling. Up to: 0,7 t/m³
P-0,7

Download technical sheet

P-1,8

Of material to handling. Up to: 1,8 t/m³
P-1,8

Download technical sheet

PR8-1,8

Of material to handling. Up to: 1,8 t/m³
PR8-1,8

Download technical sheet

P-3N

Of material to handling. Up to: 3 t/m³
P-3N

Download technical sheet

PR8-3

Of material to handling. Up to: 3 t/m³
PR8-3

Download technical sheet

P-3,5

Of material to handling. Up to: 3,5 t/m³
P-3,5

Download technical sheet

HYDRAULIC ORANGE PEEL GRABS

Technology: HYDRAULIC ORANGE PEEL GRABS

Description: Non-autonomous orange peel grab hydraulically driven by an external system. The oil under pressure must come from the excavator, truck or any other equipment where the grab will be assembled.

PNA-3

Of material to handling. Up to: 3 t/m³
PNA-3

Download technical sheet

PNA-1,8

Of material to handling. Up to: 1,8 t/m³
PNA-1,8

Download technical sheet

PNA-0,7

Of material to handling. Up to: 0,7 t/m³
PNA-0,7

Download technical sheet

MECHANICAL ORANGE PEEL GRABS

Technology: MECHANICAL ORANGE PEEL GRABS

Description: Orange peel grab operated and suspended by four ropes. THE ELECTION WILL DEPEND ON THE CRANE TO BE USED WITH THE GRAB.

PM4-0,7

Of material to handling. Up to: 0,7 t/m³
PM4-0,7

Download technical sheet

PM4-1,8

Of material to handling. Up to: 1,8 t/m³
PM4-1,8

Download technical sheet

PM4-3

Of material to handling. Up to: 3 t/m³
PM4-3

Download technical sheet